In Progress » Remora Pair » Remoras and Bridge

Sorry for the update delay, but the holidays and getting the Remoras shipped out took a good bit of time. Now that they’re here and shipped I’ve started on this pair. The clean-up went smooth enough… typical sanding and whatnot.Working with the photoetch and starting to pin it all together…

Continue Reading

In Progress » Remora Pair » Basework

(photo found on Flickr in Industrial Decay Network group) I decided to do a section of bridge over some water for the base of my Remora. The Remora will be floating above the bridge, moored to a tower similar to what’s shown in the image. The mooring point will be…

Continue Reading

In Progress » Remora Pair » Cargo

Sorry for the long absence from modeling updates. My work on Industria Mechanika has been keeping me very busy. However now I get to start building and painting the fruits of my labor! The Remora will start shipping from iMech in a few weeks and to help the anticipation go…

Continue Reading

In Progress » Fish Sub » Sealife Encrustation

Once the plaster had dried for the paddlewheel, it was time to start the sand and sea-life. I molded the rippled sand on the base using Ave’s Apoxie sculpt. Ripples were added with various sculpting tools. The warm neutral color of the dried Ave’s was a perfect base for the…

Continue Reading

In Progress » Fish Sub » Paddlewheel Part 2

I finished gluing the components of the paddlewheel together the other day using CA gel. It makes for a very interesting set-piece for the sub I think and was pretty fun to make. The difficult part was alignment which was made easier by taping everything onto my print-out and using…

Continue Reading